Key Features
• 2,398sqm warehouse, 304sqm office, and 550sqm canopy
• 10m stud at portal knee rising to 12m at the centre
• Three (3) roller doors with 10m cantilevered canopy
• Concrete yard providing excellent truck access
• Modern two (2)-level office
• Estimated completion: Q4 2026
This premium industrial complex features a high-stud warehouse with a 10m stud height at the portal knee, rising to 12m at the centre. This generous height allows for racking capacity of over 3,000 pallet spaces.
The warehouse includes a post-tensioned jointless floor, providing a durable and extremely low-maintenance working surface. The space is serviced by three roller doors, two of which are positioned beneath a 10m cantilevered canopy that opens onto a concrete yard, ensuring efficient truck access and ease of loading and unloading.
The office accommodation is arranged over two levels and constructed with a concrete mid-floor. The space is largely open plan and includes a kitchen, kitchenette, amenities, and a large meeting room ready for incoming occupants. The office is positioned to provide excellent visual connectivity across the operational face of the warehouse.
The development is scheduled for completion in Q4 2026.
Jean-Paul Smit
021 021 61616
[email protected]
James Valintine
021 023 71868
[email protected]
Sunil Bhana
021 938 660
[email protected]